Add a controlled start delay to pumps, lighting, access systems and other automation circuits. The slim VENGIM VG521T begins timing when power reaches A1 and A2, then changes its SPDT output after the selected delay from 0.1 seconds to 10 days.
Specifications
Datasheets
What's in the box
18 mm DIN-rail module with screw terminals and two front adjustment controls.
Great for
Wiring & getting started
- Isolate the circuit
Disconnect and verify the supply before touching any terminal. Use a licensed electrical worker for fixed or mains wiring in New Zealand.
- Connect the timer supply
Connect the control supply across A1 and A2. Timing starts when this supply is energised.
- Select the timed contact
Terminal 15 is common. Use 15-18 for a normally open output that closes after the delay, or 15-16 for a normally closed output that opens after the delay.
- Set the delay
Choose the range with the upper selector, then set 10-100% of that range with the lower dial. For example, 10 seconds at 30% gives about 3 seconds.
Note: The 5 A rating applies to resistive loads. Inductive loads such as contactor coils, motors and solenoids may require additional suppression or an appropriately rated external contactor.
